Since the desulfurization process uses a wet desulfurization, resulting in a large amount of waste water, which contains large amounts of heavy metal ions in water, direct discharge will cause new pollution, wastewater must be treated to achieve acceptable emission standards.
LIMING mill equipment through the use of desulfurization waste water treatment process, desulfurization wastewater is then discharged to achieve adequate treatment to achieve acceptable emission standards. LIMING is specialized in the production of large industrial milling machine manufacturers, production of the world’s largest T190 series of industrial mills, limestone, lime crushing and milling of large special starting production.
Milling equipment involved in the use of lime desulfurization of organic sulfur to generate water-insoluble metal hydroxides and sulfides gasification ceremony precipitation, in order to achieve the goal of desulfurization wastewater handling purposes, reached the required emission standards.