Which is better milling machines for processing 200 mesh coal, Nissan 40-50 tons? 200 mesh pulverized coal can be supplied main lead plant boilers, Nissan 40-50 tons, which is about 5 tons per hour.
Liming Heavy Industry Science and Technology professional and technical personnel in accordance with detailed information about the actual production needs and the production process, etc., we recommend that our overpressure trapezium mill, and from equipment performance, features, power and so very in line with actual production needs, and can largely for customers to save costs and create maximum efficiency.