In order to ensure a better impact crusher in sand production line in continuous operation in the continuation of the life of the equipment, the user should carry out regular maintenance and repair.
After the new machine into operation, class work necessary to complete back-breaking conduct a comprehensive inspection. After a week of back-breaking run of the motor, lubricating conduct a comprehensive inspection. Check the contents include a fixed portion fastening, belt drive, bearing seals, impact liner, liner wear inspection full release position, combined with the inspection cycle of maintenance and replacement schedule established rail system.
Routine inspection and maintenance should include clearance adjustment crusher rotor and counterattack liner, the timely replacement of wearing parts, regular inspection plate hammer, liner, bearing temperature.
When the rotor crusher at run time, the gap between the rotor and the counter-liner can not be adjusted. As the material into blocks of residence between the back plate and the plates and shells, it is recommended to re-adjust the gap between the impact rack slightly lifted, so blocks of feed become loose, counter rack easily adjusted. If counterattack degree sufficient enough, you can pat (with a piece of wood protection) in the relaxation rod, liner gap between the rotor and counter beam apparatus by adjusting the machine to complete, first loosen the set screw, and then scroll long nut, this When will the upward direction of movement of the lever, adjust fortunately the screw fastening sets.
Crusher when replacement of wearing parts, after first open shelves. When in use, the first after the cabinet shelves and remove the bolts, and then use the wrench to the hex head department clamshell device, and then open shelves hanging down. In the meantime, you can use the device suspended above the racks hanging next frame. Repeat the process, that is, after closing the shelves.
Counterattack broken boards hammer wear to a certain extent should be timely adjusted or replaced, in order to avoid damage to the fasteners and other parts. After opening the cover, remove ashamed pinning counterattack lining with slotted nuts, bolts can be replaced after a counterattack liner wear. Such as installing a new counter-liner, invert the above steps immediately.
Also in the usual manipulations should be checked crusher bearing temperature, if thrown exceptions, it is likely that excessive and insufficient grease, dirt or grease, there may be bearing damage, then should be checked in the amount of grease or replace grease bearings.